Pages

Monday, May 11, 2026

More Work on Run #2

 Today, I finished cutting and installing the 8" x 1-1/2 band around the base of the run and coop. All of the wire is dug in, and will be secured to the band. I plan to install "rip-rap" rock around the perimeter, against the band and out about 1 foot or so. 







No comments:

Post a Comment